Phased In Applications:
The Tough Stuff system can be applied over several years in phases starting with the seams while still receiving a waterproofing warranty. Warranties are piggybacked as the system is completed.
Fast, Simple Application:
A three man crew can clean prime, and finish over one thousand lineal feet of seams in one day. That is three times as fast as the best cover tape option.
Non-Destructive:
Finishing system utilizes the single ply’s inherent strength and marries with the material to double the previous physical properties. The customer retains the value of the previous system.
Conversion to a Renewable Assembly:
The new assembly can be renewed by recoating on a five to ten year interval depending on the customer’s budget. This lowers the life cycle costs of the system to one tenth the average cost of tear off and replacement.
Accounting Advantages:
Depending on the circumstances, the customer may be able to expense the system in one year as maintenance or capitalize the project depending on his accounting situation. This can substantially decrease the net cost of the applied system.
Highly Advanced Technology:
Coatings International’s research and development utilizes the most advanced urethane chemistry in the roofing industry today. Ironically, the net result is a user friendly system with little technical training required.
Cold Temperature Applications:
System can be applied at temperatures down to 30°F (-1°C). This allows for repairs in the winter when problems can be at their worst.
Low Applied Cost:
Materials and labor for seam restoration typically cost about one half that of butyl backed cover tape.